IMG-20241227-WA0042
Tiling and painting works in the security room for Baker Hughes.

We proudly completed tiling and painting works in the security room for Baker Hughes, ensuring a functional and aesthetically pleasing space. The project involved precise tiling for durability and easy maintenance, complemented by high-quality painting to create a professional and polished environment.

Read more
Installation of electrical panels and connection of cables for Baker H
Vertex Delivers Comprehensive Solutions for Baker Hughes

Vertex has successfully completed a range of projects for Baker Hughes, including: • Painting Works: Enhancing the durability and aesthetics of the base and ladders. • Welding Works: Ensuring structural integrity through precise welding services. • Laboratory Container Repair: Restoring functionality and safety. • Electrical Installations: Installing and connecting electrical panels with precision. • Office…

Read more
V7294 Preparation of room on welding shop for Baker H3
Preparation of Welding Shop Room and Installation of Wall Racks for Baker Hughes

Vertex has been engaged in preparing a room within the welding shop and securely installing racks to the walls for Baker Hughes. The preparation of the room was carefully personalized to meet the operational needs of the welding shop, while the installation of wall racks was conducted to enhance storage and organization, improving workflow efficiency.

Read more
V7717 Repair of ventilation motor for Baker h
Vertex Enhances Operational Efficiency for Baker Hughes

Vertex Company has successfully provided comprehensive services for Baker Hughes, including airline preparation and the repair of the ventilation motor with delivering made-to-order solutions designed to meet the specific operational needs of their facility, applying industry-leading expertise and precision throughout both projects.

Read more
İnstallation of AC for Baker H2
Installation of AC for Baker Hughes

Vertex Company completed the air conditioning (AC) installation work for Baker Hughes. Expertise team delivered high-quality installation services, ensuring optimal climate control solutions that meet the demanding requirements of the Baker Hughes.

Read more
V7213.1
Baker Hughes

Vertex Co. carried out the relocation of Baker Hughes’ operations base to a new location. Activities included construction, welding, metal fabrication, HVAC systems installation and maintenance, equipment and materials supply, and more.

Read more
8
Baker Hughes Metal Dismantling and Installation Activities
Read more
6
Baker Hughes Crane Foundation Installation
Read more