Through meticulous planning and precise execution, our team ensured that all systems were effectively isolated, enabling safe maintenance and operations throughout the process. We are committed to supporting our clients by providing robust and reliable services tailored to their needs. We look forward to continuing our successful partnership and contributing to the ongoing safety and…
We proudly completed tiling and painting works in the security room for Baker Hughes, ensuring a functional and aesthetically pleasing space. The project involved precise tiling for durability and easy maintenance, complemented by high-quality painting to create a professional and polished environment.
Vertex has successfully completed blasting and painting of mineral oil pipe materials for SOCAR Polymer, ensuring durability and superior quality standards.
Vertex has been engaged in preparing a room within the welding shop and securely installing racks to the walls for Baker Hughes. The preparation of the room was carefully personalized to meet the operational needs of the welding shop, while the installation of wall racks was conducted to enhance storage and organization, improving workflow efficiency.
Vertex has been actively involved in the preparation of a drainage line and the repair of asphalt at the Cameron Base, providing custom-made infrastructure solutions to support the facility’s operational needs. The drainage line was properly installed to prevent potential issues, while the asphalt repairs were conducted to improve the durability and safety of the…
Vertex Co. carried out the relocation of Baker Hughes’ operations base to a new location. Activities included construction, welding, metal fabrication, HVAC systems installation and maintenance, equipment and materials supply, and more.