V7789 Replacing Led lights on the base - Cameron .2
Replacing LED Lights and Conducting Welding Works at Cameron Base

Vertex has been actively engaged in replacing LED lights and performing welding works at the Cameron Base ensuring a seamless installation process for the LED lights while minimizing disruptions to ongoing operations.

Read more
V7103.1
Installation of Scaffold Platforms for Cameron during Equipment Repair

Vertex was engaged in the installation of scaffold platforms as part of the equipment repair process for Cameron adhering to the highest industry standards and provided expert solutions tailored to enhance safety and accessibility during the repair operations.

Read more
V7717 Repair of ventilation motor for Baker h
Vertex Enhances Operational Efficiency for Baker Hughes

Vertex Company has successfully provided comprehensive services for Baker Hughes, including airline preparation and the repair of the ventilation motor with delivering made-to-order solutions designed to meet the specific operational needs of their facility, applying industry-leading expertise and precision throughout both projects.

Read more
İnstallation of AC for Baker H2
Installation of AC for Baker Hughes

Vertex Company completed the air conditioning (AC) installation work for Baker Hughes. Expertise team delivered high-quality installation services, ensuring optimal climate control solutions that meet the demanding requirements of the Baker Hughes.

Read more
IMG-20230604-WA0032
Vertex Delivers Subsea7 Heat Exchanger Repair at Derrick Barge

Vertex Company carried out precise repairs and refurbishment of damaged/worn components to restore the heat exchangers to optimal condition.

Read more
IMG20230614084909
Subsea7 HVAC Works at Derrick Barge Azerbaijan done by Vertex Company.

Vertex Company delivered high-quality HVAC solutions in challenging offshore environments, enhancing comfort and operational efficiency for Subsea7 at Derrick Barge Azerbaijan.

Read more
IMG-20230429-WA0012
HVAC System Manufacture and Installation at SOCAR Downstream by Vertex

Vertex Company developed a custom HVAC system design tailored to the specific requirements and operational needs of SOCAR Downstream and expertly installed the HVAC system, ensuring precise alignment and integration with existing infrastructure.

Read more
IMG-20230503-WA0044
Vertex Delivers Comprehensive HVAC Solutions at SOCAR Downstream/HAOR Area with Manufacturing Workshop

4-in-1 Mobile HVAC Manufacturing & Installation Solutions: Vertex has effectively established a Mobile HVAC Facility that includes a Workshop, Office, Dining/Changing Room, and Warehouse. This integrated and unified solution ensures significant project cost reductions.

Read more
IMG-20230526-WA0019
Weatherford Testing Output Voltage of Transformer Completed by Vertex

Vertex Company identified the specific requirements and parameters and performed detailed testing of the Transformer’s Output Voltage, measuring and recording the voltage levels under various operating conditions.

Read more
1683203652076
Weatherford Fiber Optic (FO) Cable Works at Haydar Aliyev Platform Completed by Vertex

Fiber Optic cable works at the H. Aliyev Platform for Weatherford was successfully accomplished by installing the fiber optic cables throughout the platform, ensuring precise routing and secure attachment.

Read more
IMG_20220811_163621
Saipem Schneider Equipment Test & Repair at Khankendi by Vertex Company

Vertex performed thorough testing procedures to assess the equipment’s functionality, performance, and compliance with operational standards and executed precise repairs to address identified issues.

Read more
IMG-20230605-WA0010
Vertex completed Advanced Pipe Insulation for Halliburton Offshore

Vertex expertly installed the insulation on the pipes, ensuring precise application and coverage to maximize thermal efficiency and protect against environmental factors and chose high-quality insulation materials for optimal thermal protection and resistance.

Read more
IMG-20210929-WA0077
Halliburton install of Backdraft damper

Vertex Company performed Backdraft Damper Installation works in Halliburton adhering to industry best practices and safety standards. Vertex’s expert team conducted a thorough site assessment to determine the optimal placement and specifications for the Backdraft damper.

Read more
20220119_112741
Saipem ATLAS Shore Docker

Vertex supplied Saipem with the ‘Shore Docker’ made by Atlas Offshore and provided training.

Read more
V7313 Replacement cable and ATEX Inspection for Vero on Weatherford2
Monteneqro Weatherford

Vertex tailored Electric services for Weatherford’s Off-Shore Montenegro project, covering ATEX İnspections, İnstallation, Maintenance and Troubleshooting.

Read more