Vertex performed thorough testing procedures to assess the equipment’s functionality, performance, and compliance with operational standards and executed precise repairs to address identified issues.
Vertex expertly installed the insulation on the pipes, ensuring precise application and coverage to maximize thermal efficiency and protect against environmental factors and chose high-quality insulation materials for optimal thermal protection and resistance.
Vertex Company performed Backdraft Damper Installation works in Halliburton adhering to industry best practices and safety standards. Vertex’s expert team conducted a thorough site assessment to determine the optimal placement and specifications for the Backdraft damper.
Vertex supplied Saipem with the ‘Shore Docker’ made by Atlas Offshore and provided training.
Vertex tailored Electric services for Weatherford’s Off-Shore Montenegro project, covering ATEX İnspections, İnstallation, Maintenance and Troubleshooting.
Vertex performed Electric & HVAC Services for Cameron, emphasizing safety, efficiency, and innovation.
Vertex Co. carried out the relocation of Baker Hughes’ operations base to a new location. Activities included construction, welding, metal fabrication, HVAC systems installation and maintenance, equipment and materials supply, and more.
Vertex, performed “Explorer of the Seas” Cruise Liner – Repair Project (inc. Welding, Pipe-Fitting, Fit-Out, etc. activities) in Cadiz, Spain for the Royal Caribbean Group.
Vertex Company being an EPC contractor performed General MEP and Fit-out works of the SOCAR Gas office in “Port Baku” building.